How Long Does It Take To Install Microcement?

Microcement installation typically takes 3 – 5 days for the application and drying time. but can range from 2 days to over a week depending on the project’s size, complexity, and the number of surfaces involved. Each layer requires sufficient drying and curing time, and a final curing period of up to 7 days or more is needed for the surface to develop its full hardness and resistance.

Factors Influencing Installation Time

Project Size: Larger areas require more time for preparation, application, and drying.

Complexity: Intricate designs, unique features, or non-standard layouts will extend the timeline.

Surface Type: Preparing different surfaces (like tiles, plaster, or concrete) can vary in time and require specific primers.

Drying & Curing Times: Each layer needs adequate time to dry and the entire surface requires a significant curing period after the final sealer is applied before it can be used.

Experience of Installers: Skilled professionals ensure efficient timelines without compromising quality.

Environmental Conditions: Humidity and ventilation can affect drying and curing times.

Key Steps & Timeline

Step 1 – Preparation: Cleaning and repairing the surface, then applying a primer.
Step 2 – Base Coat: Applying the first layer of microcement.
Step 3 – Second Coat: Applying the second layer, often in the opposite direction.
Step 4 – Sanding: Smoothing out imperfections after the coats have dried.
Step 5 – Finishing Coat: Apply the final layer of microcement, which contains the desired colour and texture.
Step 6 – Sealing: Applying a protective sealer to enhance durability.
Step 7 – Curing: Allowing the surface to harden and cure properly before use.

CALL US TODAY FOR FAST ASSISTANCE

0424 408 330

OR FILL OUT THIS FORM TO REQUEST A FREE QUOTE

"*" indicates required fields

Name

"*" indicates required fields

Name